<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/"><channel><title>Rack-1 on NordicLab</title><link>https://nordiclab.org/tags/rack-1/</link><description>Recent content in Rack-1 on NordicLab</description><generator>Hugo -- 0.166.0</generator><language>en-us</language><lastBuildDate>Mon, 14 Sep 2026 00:00:00 +0000</lastBuildDate><atom:link href="https://nordiclab.org/tags/rack-1/index.xml" rel="self" type="application/rss+xml"/><item><title>Noritsu V50 (QSF) — Adjusting the Pitch of the Processing Rack</title><link>https://nordiclab.org/repair-help/noritsu-v50-rack-gear-pitch/</link><pubDate>Mon, 14 Sep 2026 00:00:00 +0000</pubDate><guid>https://nordiclab.org/repair-help/noritsu-v50-rack-gear-pitch/</guid><description>How to realign the drive sprocket and feed idle gear timing marks after removing them from a Noritsu V50 processing rack shaft — the one correct gear position and why it matters.</description></item><item><title>Noritsu V50 (QSF) — Replacing the GUIDE, FILM Part in Rack 1 (CD)</title><link>https://nordiclab.org/repair-help/noritsu-v50-guide-film/</link><pubDate>Sun, 13 Sep 2026 00:00:00 +0000</pubDate><guid>https://nordiclab.org/repair-help/noritsu-v50-guide-film/</guid><description>Identifying and replacing the GUIDE, FILM part (A239395-01) in a Noritsu V50 Rack 1 — the small two-pronged plastic clip that keeps film pressed into the roller path at the handoff between roller pairs, and a common, easy-to-miss cause of repeat jams at the same spot.</description></item><item><title>Noritsu V50 (QSF) — Rack 1 (CD) Disassembly: Stuck Leader Card</title><link>https://nordiclab.org/repair-help/noritsu-v50-rack1-leader-card/</link><pubDate>Fri, 11 Sep 2026 00:00:00 +0000</pubDate><guid>https://nordiclab.org/repair-help/noritsu-v50-rack1-leader-card/</guid><description>Removing a leader card stuck in Rack 1 (CD) on a Noritsu V50 — draining the CD solution, pulling the rack, opening the side plate, and the full processing-tank cleaning procedure this rack goes through during scheduled maintenance.</description></item></channel></rss>